[ 포럼디앤피 | 실행부 ] BIM-(BEP;BIM Execution Plan / plan d’exécution BIM / BIM 수행 계획)-국가별 통합분석 (업데이트-20240227)

FORUM BIM EXECUTION

Global Standard Practice Guide



BIM-Execution-Plan-GOALS, Source : Linki 

Guide by region

  • France
  • Korea
  • USA

Guide by Platform

  • Revit
  • Archicad

  •  16 Point Checklist in BIM BIM Execution Plan

  1. A brief introduction to the project
  2. The BIM/model uses – what the BIM/modeling will be utilized for
  3. The roles and responsibilities of those involved
  4. What success for BIM looks like on the project
  5. Any Key Performance Indicators (KPIs) that will be used
  6. Important project milestones
  7. The deliverables that must be produced
  8. The software and hardware that will be required
  9. The technology budget/plans for the project
  10. Standards to be followed (for example, the BIM Forum LOD Spec or ISO 19650 Level of Information Need)
  11. Process maps to help describe workflows
  12. The training requirements for teams to get the best out of BIM
  13. The risks and opportunities associated with using BIM on the project
  14. The timeline for the project
  15. The BIM quality management processes to be used
  16. Contract terms
  • Le plan d’exécution BIM a été reconnu comme un document évolutif qui comprend généralement:
  1. la portée du projet
  2. détails sur la stratégie de livraison
  3. définition des rôles et responsabilités BIM
  4. les jalons du projet
  5. le résumé de la capacité et de la capacité de l’équipe de livraison
  6. l’utilisation des ressources informatiques
  7. collaboration / génération de données / échange d’informations
  8. la norme du projet
  9. les méthodes et procédures du projet
  10. propriété des données
  11. livrables / clôture du projet
  • Works (Sample)
  1. Généralités
  2. Objectifs et cas d’usages sur l’opération
  3. Rôle et responsabilité BIM
  4. Environnement BIM
  5. Organisation et processus pré-production
  6. Processus BIM en conception
  7. Livrables
  8. Processus BIM en chantier
  9. Conditions Générales BIM
  • BIM 업무수행계획서 표준 템플릿
  1. 사업개요
  2. BIM 적용기준
  3. BIM 업무수행 환경
  4. BIM 업무수행 일정계획
  5. BIM 데이터 작성 계획
  6. BIM 품질관리 계획
  7. BIM 성과품
  8. 책임과 권리

Reference


2023. 5. 16

건축가 이인기_Lee Inki
파리말라케국립건축학교, 프랑스국가공인건축사 DPLG | 파리8대학교, 박사과정 DEA
FORUM Leaderships
건축·도시·데이터과학 | 디렉터
건축-IT융합 프로젝트관리

(주)포럼디앤피(FORUM D&P Inc.) 한국, 대표
FORUM D&P SARL, France, Gérant
ATAT Architects 대표 건축가

(주)포럼디앤피 | 2008년 건축가들이 설립한 (주)포럼디앤피는, 아키테라피라는 건축철학을 실현하기 위해, 현대사회에 필요한 건축의 혜택을 탐구하고 실천했으며, 양질의 건축을 실현하기 위한 기술역량을 갖추고 있다. 마스터플랜, 주거, 종교, 의료, 복지, 상업, 문화시설 분야에서 작업했고, 현재는 건축건설사업의 전과정인 기획-설계-건설-운영이라는 프로세스의 리더로서 건축가를 정의하고 작업을 하고 있다. 특히 데이터를 접목한 디지털건축과 스마트시티라는 분야에서 특화된 위치를 확보하고 있다.

( 연구 및 상업용도 활용시 출처를 밝히고 사용하기 바랍니다)
--------------------------------------------------